Access controls are in place by floor, lab and office for ITAR projects. The facility has 5 labs with a different focus which enable Additive Manufacturing and Printed Electronics project to be created, designed, prototyped, tested and integrated in a single location.
The PERC facility dedicated to developing printed electronics occupies the 4th floor of the Saab ETIC. The facility was completed in late 2014 and has been operational since 2015.