04/06/2023
By Lisa Rolfe
When determining the date of switchover for each building, Facilities Management considers prevailing weather, building HVAC capabilities, type of system controls, and building usage. The current practice targets mid-May as an estimated switchover completion date for changing system modes from heating to cooling and is consistent with New England HVAC standards. However, statistics show there are typically several isolated days within the cooling season that may require heating.
When Facilities Management receives calls about building temperatures during the shoulder season, we ensure systems are functioning correctly. However, indoor temperatures may drift beyond established guidelines during these unpredictable days. Campus community members are encouraged to prepare accordingly for daily weather conditions to help minimize the effects of these temperature changes.
We hope this provides a better understanding of how UMass Lowell building systems work and the challenges we face during the shoulder season in New England. We apologize for any inconvenience from short, uncomfortable temperature periods that may occur during this time.